2015 Subaru WRX STI front aero
Designing a splitter and stacked canards, comparing three configurations at 70 mph, and fitting the parts to my bumper.
Read full report →Computer Science at University of California, Santa Cruz
Here’s some stuff I build for fun and a few things I fix along the way.
Swapped out my friend’s OEM turbo for a bigger CTS turbo kit on his 2011 2.0T Audi B8 to make more boost and power on his built block.
My fish scale wouldn’t turn on, so I opened it up. The wires had broken off the circuit board, and I soldered them back on.
I dropped my G7 X Mark II off a balcony and ended up replacing the lens assembly, housing, and flash.
I tore down the engine in a 2011 Prius to replace the head gasket, all because of that tiny patch of missing coating on the edge. Annoying job, but I still had fun.
One too many launches burned up the clutch in my STI, so I replaced it with a heavier Stage 3 racing clutch.
I drilled the F-250’s door panel for an old swing-lock bracket, then modified the bracket to hold a vertical tow mirror from a ’70s Ford.
Designing a splitter and stacked canards, comparing three configurations at 70 mph, and fitting the parts to my bumper.
Read full report →How the desk robot’s shoulder drive, sensor packaging and motion limits were sized and checked in CAD.
How two bicycles load a welded trolley rack, and why its 279 lb modeled weight changes the mounting decision.
Turning public job postings into skill-demand estimates and traceable resume matches, including a false signal caught in the hiring data.
How a file moves from an upload to a downloadable conversion, and what happens when a worker stops, a transfer fails, or the user cancels.
I was getting my 2015 Subaru WRX STI ready for the track, so I decided to design and build my own front aero. I modeled the look I wanted in SolidWorks, with a wide splitter and two sharp, Varis-inspired canards at each corner. Then I used Flow Simulation to see how much front downforce I could gain with that shape and what it would cost in drag.
I started with a 75 in (1,905 mm) tape measurement under the car to set the nominal splitter width. The existing lip drops 1.5 in (38.1 mm) below the bumper. In CAD I placed the splitter 105 mm above the road and its leading edge 61 mm ahead of the lip at the centerline. Those two estimates set the gap under the splitter and how much of it projects into the airflow.
I traced the upper canard from a high-angle photo of my bumper. It has a short, straight front edge, a clipped corner below the fog light, and an upturned outer edge toward the wheel. The lower blade follows the same outline with a slightly larger footprint. I estimated a nose-down pitch of 16° for the upper blade and 15° for the lower one from the available photos.
I ran the same simplified STI model with steady airflow straight ahead at 70 mph (31.3 m/s). I started with the lip alone, added the splitter and endplates, then added the stacked canards. Each result is the mean of the final 20 recorded iterations.
I used zero yaw, 101,325 Pa ambient pressure, and a temperature of 293.15 K. The model had a simplified underbody and four stationary tires. The computational domain extended from −7 to 7 m laterally, from −0.05 to 8 m vertically, and from −27 to 12 m along the forward axis.
All three runs used the same Boolean mesh setting and nominal mesh level 2, producing 174,207 to 174,262 fluid cells. I integrated pressure and shear over the vehicle and aero surfaces, excluding the stationary road. I used the pitching moment about the point on the road below the front axle and the 2,650 mm wheelbase to calculate equivalent front and rear axle loads.
| Configuration | Drag | Total lift | Front-axle lift | Rear-axle lift |
|---|---|---|---|---|
| Lip only | 411.1 | +121.3 | −20.4 | +141.7 |
| With splitter and endplates | 430.9 | +58.8 | −119.1 | +177.9 |
| With stacked canards added | 428.8 | +59.7 | −118.3 | +177.9 |
The splitter and endplates added 98.7 N of predicted front downforce and 19.8 N of drag. Adding the canards reduced modeled drag by about 2 N and changed front-axle lift by just +0.8 N. The splitter accounted for nearly all the change in front loading. With one speed and one mesh setting, uncertainties in bumper fit, ride height, and mesh resolution limit what I can conclude about the smaller canard effect.
These sections cut through the middle of the car. SolidWorks scaled the color legend separately for each run. The color bands show where pressure changes within a run. The force table above gives the numerical comparison across runs.
I transferred the CAD dimensions to ABS sheet, cut the parts with a rotary cutter, and sanded the edges. I held each piece against my bumper to check the fit, then trimmed and sanded the places that needed a little more clearance. Each canard sits on an L-bracket with one leg bolted to the bumper and the other supporting the blade from below. Inboard angle brackets join the endplates to the splitter.
All dimensions are in millimeters. The notes identify which dimensions came from tape measurements, photographs, or CAD estimates. Select a drawing to see the dimension lines at full size.
The 1,905 mm width comes from the tape run beneath the car. The separate 420–430 mm measurement follows the bumper corner. I modeled the rear overlap and the 6.35 mm plate thickness. The drawing leaves the final rear profile and fastener positions for fitment on the car.
The tape measurements were about 416 mm along the base, 340 mm along the top, and 137 mm high near the wheel. The forward station measured 92–95 mm high. The CAD sheet shows the tapered profile, a 5 mm endplate, and the estimated 3 mm wall of the bracket that sits inboard on the splitter.
I drew the left upper and lower blades from the bumper photos and mirrored them for the right side. The drawing uses 4 mm sheet for the blades, 3.2 mm sheet for their outer walls, and one 3 mm-wall L-bracket under each blade. The bracket dimensions and blade angles are estimates from the photographs.
I designed a three-axis robot to reach 425 mm from a fixed desk mount while keeping its sensor head clear of the surface. A collision at the original lower tilt limit drove a joint-limit revision. The saved Fusion assembly passed 142 digital checks, with three physical checks outstanding. The shoulder meets its torque-margin target at nominal print mass and falls below target in the solid-print scenario.
The requirements fix the robot’s working envelope and establish what evidence would support a physical build.
| Requirement | Design target | Evidence and next check |
|---|---|---|
| Desk installation | 220 × 260 mm plate with positive anchorage | CAD defines the footprint. Clamp geometry and desk capacity require measurement. |
| Motion and reach | ±90° yaw, 0–120° shoulder, −30° to +60° tilt | Fusion checks joint limits and linked motion. Use independent angle measurements to establish physical repeatability. |
| Clearance | At least 5 mm between the moving assembly and desk | Compare the lowest sampled geometry with the requirement. Repeat a supported hand sweep with actual wiring and hose. |
| Shoulder capacity | At least 1.5× rated-torque margin in the sizing study | Calculated margin depends on print mass and servo rating. Weigh the moving parts and repeat the load calculation. |
| Board access | Fit the UNO, Pi and two head sensors with serviceable connections | CAD reserves component volume. Trial-fit connectors, board retention and flex routing before an integrated build. |
Dimensions are in millimetres. Fusion v7 supplies the native motion and material results. The photographs show the saved Fusion v7 model. Dimensions are nominal design values. The wiring architecture is a proposed bench design.

Follow the load from the head through the shoulder shaft, into the yaw bearings, and down to the steel base plate.

The lower yaw bearing and retainer go together while the underside is accessible. The base cover fits over the hub before the larger turntable is attached.
The two head halves capture the barrel root and retaining band. The sensor pod mounts underneath on a manually adjustable pivot.
The side view locates the two arm pivots. The table gives nominal design dimensions. Open the native Fusion drawing set for the assembly projections and part-number balloons.
| Feature | Nominal dimension | Reference |
|---|---|---|
| Base plate | 220 × 260 × 3 mm | The steel plate sits on the desk. |
| Printed cover | 220 × 220 × 71 mm | The cover encloses the stationary drive and controller. |
| Shoulder axis | 140 mm | Height above the desk at the modeled mounting plane. |
| Level reach | 425 mm | Yaw axis to the shroud tip in the parked pose. |
Dimensions are in millimetres unless otherwise indicated.
The R1 joint schedule records 73 fastener locations. At the yaw tower, the candidate M4 screw is 10 mm long. The modeled grip is 6 mm and the receiver depth is 3 mm. A 1 mm packing washer gives 10 − 6 − 1 = 3 mm of nominal engagement. Available depth, head access and insert strength still need a fit trial.
At the assumed 70% effective material volume, the 220 × 220 × 71 mm base cover is estimated at 312.6 g and the 110 × 110 × 49 mm yaw tower at 116.3 g. The parts register distinguishes fixed mass from parts carried by the shoulder. The latter changes drive torque with arm angle.
The yaw bearings carry the turntable. The gear pair sets its angle. At the shoulder, belt reduction gives the servo more leverage over the long arm.


| Joint | Drive and support | Modeled travel |
|---|---|---|
| Base yaw | 1.67:1 external gear reduction · two 61810 bearings | −90° to +90° |
| Shoulder pitch | 2.5:1 belt reduction · two 608 bearings | 0° to +120° |
| Head tilt | Direct servo drive · pivot pin and one 608 bearing | −30° to +60° |
The sensor pod has a separate manual angle adjustment. The three servos drive the base, shoulder and head.
Gravity loads the shoulder most heavily when the arm extends away from the base. The sizing study treats the moving parts as point masses and includes allowances for friction, hose drag and acceleration.
Nominal joint torque divided by pulley reduction and assumed transmission efficiency.
Assumes the selected servo matches the candidate rated torque. Continuous duty still needs measurement.
| Effective material volume | Calculated shoulder margin | Against 1.5× target |
|---|---|---|
| 50% | 2.26× | Above target |
| 70% · nominal | 1.83× | Above target |
| 100% · solid | 1.43× | Below target |
Effective material volume describes the fraction of solid CAD volume occupied by plastic. Slicer infill, walls and top and bottom layers together determine the actual print mass.
The nominal case clears the 1.5 design target by 0.33. At the assumed 0.981 N·m rating, a 1.5 margin allows about 0.654 N·m of motor demand. That leaves approximately 0.119 N·m above the nominal 0.535 N·m estimate. Weighing the moving assembly and locating its center of gravity will narrow that uncertainty before a motor is qualified for continuous operation.
Three stills from the Fusion motion study show the return toward the parked position. The angles below are the commanded joint positions, rounded to the nearest degree.



The turntable carries the shoulder and arm. Shoulder pitch carries the head pivot with it. Head tilt is measured relative to the arm, so its angle alone cannot tell you the barrel’s angle to the desk.
The sensor pod is set manually to −16° throughout these three views. The moving frames hide the flexible hose. Its bending and drag need a physical mockup.
The Fusion joint sweep checked angular travel and return to the starting pose.
Teal solids reserve space for electronics in three locations. The fixed base carries the controller, the moving shoulder carries the computer, and the sensor pod faces forward below the head.



Three candidate servos at their listed stall current total 8.1 A. The proposed bus adapter is rated for 5 A. The electrical plan gives the Pi its own supply and routes motor current through separately protected branches. The adapter handles servo communication.
Board envelopes describe packaging. Detailed PCB layouts, installed wiring and connector clearances require the selected hardware.
The Pi handles sensing and servo communication. A separate motor rail supplies the actuators, and the UNO supervises the contactor enable.
| Path | Connections in the proposed prototype |
|---|---|
| Sensor data | Camera Module 3 over CSI and MLX90640 over I²C to Raspberry Pi 5. |
| Motion commands | Pi USB to the servo bus adapter, then the shared data bus to the three actuators. |
| Motor power | 12 V supply through the main fuse and K1 contact to individually fused servo branches. |
| Enable and stop | A normally closed stop contact feeds the coil circuit. The UNO monitors limits and heartbeat and controls the coil driver. |
| Logic power | The Pi uses its own supply and exchanges supervisory data with the UNO over USB. |
The Pi also exchanges supervisory data with the UNO over USB. The adapter and servos share a signal reference. The Pi logs events from its own supply when motor power opens.
The physical stop opens the coil feed. The UNO can independently remove the driver enable. The proposed lamp test checks both actions before motors are connected.
Bench architecture only. Connector pinouts, protection coordination and mechanical shoulder restraint require hardware verification.
The 160 mm barrel sets the silhouette. Lowering the head at the bottom of the shoulder sweep exposed a collision that the arm’s neutral pose concealed.
At zero shoulder angle the rigid model extended 42.54 mm below the desk.
The same shoulder position gave 28.84 mm clearance in the R1 geometry study.
The native v7 desk check made 63 component bounding-box measurements. Its lowest result was 28.39 mm, above the 5 mm design target. The joint sweep returned to its starting pose, and the material check found PETG on all 38 printed bodies.
Belt tooth engagement and tension, drivetrain backlash and behavior under load, and flexible-hose clearance through travel remain open. Printed mass, joint play and cable drag can change the real clearance.
Sources include the R1 clearance study and the archived Fusion v7 validation run.
A passing CAD result answers a specific geometric question. Each row gives the method, the observed result and the claim it supports.
| Check and method | Criterion | Observed result |
|---|---|---|
| Yaw link · Fusion v7 | Opposite rotation at 60/36 | −1.66667 pinion turns per output turn. Pass. |
| Shoulder link · Fusion v7 | Same rotation at 100/40 | 2.50000 drive turns per output turn. Pass. |
| Return pose · Fusion v7 | Maximum displacement ≤ 0.02 mm | 0.00 mm after the combined sweep. Pass. |
| Desk sweep · Fusion v7 | Minimum height ≥ 5 mm | 28.393 mm in 63 bounding-box checks. Pass. |
| Rigid interference · FreeCAD R1 | No overlap above 0.5 mm³ at sampled poses | No reportable overlaps in 150 poses. A deliberately out-of-range shoulder pose yielded 12 overlaps. |
| Control logic · host simulation | Inhibit at boot and respond to stop, limit or lost heartbeat | Host tests passed the inhibit, trip and recovery cases. UNO R4 WiFi firmware compiled. Installed stop timing is open. |
The native run totals 142 passed, 0 failed and 3 untested. The FreeCAD study and controls tests are separate evidence. The native validation register below gives the totals for each check family.
The project began with a silhouette and a motion envelope. Each design stage produced a record that a future builder can inspect.
Set the 220 × 260 mm base footprint, three powered axes, 425 mm level reach and 5 mm minimum desk-clearance target. Keep the pod adjustable by hand.
Deliverable Requirements register with target ranges, assumptions and acceptance criteria.
Split the assembly into base, pinion, turntable and shoulder, shoulder drive, arm, head, sensor pod and flexible hose. Specify purchased bearings, shafts and fasteners alongside the 38 prints.
Deliverable Revision-controlled CAD, dimensioned drawings, component register, mechanical BOM and 73-location screw schedule.
Estimate moving mass and shoulder torque across print-fill scenarios. Reserve space for boards and wire passages, define the power split and plan the supervisory control logic.
Finding Estimated shoulder torque margin falls from 1.83 at nominal fill to 1.43 for solid prints, against a 1.5 design target. Actual print mass matters.
Check component inventory, material assignments, joint limits, drive ratios, desk clearance and return pose on the saved native model. Record results by revision.
Deliverable Fusion v7 run with 142 passes, zero failures and three physical checks outstanding. The assembly views and drive details document the design.
These stages describe a proposed inert build. Each stage has an observable result before the next commitment.
Measure actual boards, horns, bearings, hose, printer bed and desk clamp. Print the 608, 61810 and M3 insert coupons. Trial-fit the board carriers, shaft and pulley retention.
Proceed when Fits are recorded, the drive retains its parts, and board and connector access works with the selected hardware.
Update dimensions and the BOM from the trials. Print and weigh the parts. Assemble the yaw stack, shoulder drive, arm and head in access order. Route an inert hose and wiring with the base anchored.
Proceed when The supported assembly moves by hand through its limits with usable slack, secure retention and measured desk clearance.
Bench-check sensing, motor isolation and the independent stop. Use a supported fixture to check each axis for belt tracking, play, current, heating and position repeatability.
Proceed when Measured results meet the acceptance criteria, including controlled shoulder behavior on power loss.
Run slow coordinated motions on an anchored inert prototype. Measure clearance, routing, loads and repeatability. Record discrepancies, revise the CAD and repeat affected checks.
Final record As-built BOM, measured results, photographs and a revised risk register. Any functional suppression system is a separate qualified integration project.
Record the hardware revision, setup, measurement and disposition for each test. The three untested Fusion items are assigned to bench checks here.
| Open item | Test setup | Acceptance evidence |
|---|---|---|
| Belt engagement and tension | Supported shoulder fixture with the selected belt, pulleys and servo horn. Sweep the permitted travel by hand. | Record the vendor tension criterion, measured setting, tracking and tooth engagement. Resolve slipping or binding. |
| Backlash and drive loads | Supported axis with an independent angle reference. Repeat the return move ten times and log current and temperature. | Compare return error against the provisional ±1° target. Establish measured load and thermal limits before coordinated operation. |
| Flexible hose clearance | Fit the inert loop and wiring on the anchored assembly. Sweep combined poses, including the low shoulder and head limits. | Record the worst desk clearance against 5 mm, slack at endpoints, bend radius and any pinch or drag. |
| Stop and power loss | Use a lamp first. After bench qualification, repeat on an independently supported axis. | Record lamp extinction, restart inhibition, stop time and shoulder drop. Set the allowable drop from fixture clearance before testing. |
Each open fit or test finding goes back to the relevant CAD feature, BOM line or control setting. Repeat the affected checks on the revised model and keep the measured record with the build.
The saved v7 register contains 145 checks. Grouping by subsystem shows where CAD supplies evidence and where hardware is still needed. The return-to-pose check helps distinguish a reversible joint sweep from an unintended edit to the model.
| Check family | Passed | Untested |
|---|---|---|
| Assembly | 6 | 0 |
| Clearance | 28 | 0 |
| Collision | 31 | 0 |
| Hose | 4 | 1 |
| Integrity | 5 | 0 |
| Joint limits | 4 | 0 |
| Joint motion | 30 | 0 |
| Joints | 16 | 0 |
| Mass | 1 | 0 |
| Parameters | 1 | 0 |
| Timeline | 1 | 0 |
| Transmission | 15 | 2 |
The revised head limit resolves the modeled desk collision, and the nominal shoulder calculation clears the design target. Qualification now depends on measured print mass, belt engagement, backlash, flexible-line clearance and stop behavior on an independently supported axis.


| Feature | Nominal dimension | Reference |
|---|---|---|
| Base plate | 220 × 260 × 3 mm | The steel plate sits on the desk. |
| Printed cover | 220 × 220 × 71 mm | The cover encloses the stationary drive and controller. |
| Shoulder axis | 140 mm | Height above the desk at the modeled mounting plane. |
| Level reach | 425 mm | Yaw axis to the shroud tip in the parked pose. |


| Feature | Nominal dimension | Reference |
|---|---|---|
| Yaw pitch diameters | 54 mm / 90 mm | 36-tooth pinion and 60-tooth ring gear, module 1.5, 20° pressure angle. |
| Yaw shaft spacing | 72 mm | Center distance of the external gear pair. |
| Pulley pitch diameters | 25.465 mm / 63.662 mm | 40-tooth and 100-tooth pulleys. |
| Shoulder belt | 260 × 6 mm | 130 teeth at 2 mm pitch. Nominal centers are 56.79 mm apart. The cradle allows ±2 mm of tension adjustment. |

| Feature | Nominal dimension | Reference |
|---|---|---|
| Arm pivot spacing | 220 mm | Shoulder axis to head-tilt axis. |
| Head housing | 115 × 75 × 65 mm | Length, width and height of the housing. |
| Shroud | 160 mm long | 35 mm outside diameter and 31 mm inside diameter. |
| Arm section | 50 mm deep | 3 mm walls and 6 mm ribs. Nominal side clearance for the tilt servo is 0.2 mm. |
| Head fork | 48 mm opening | The shroud axis lies 10 mm above the head-tilt axis. |
| Sensor pod | 58 × 30 × 27 mm | Nominal envelope below the head. Tilt pivot pin is Ø8 mm with a 608 bearing. |
Each assembly has an isometric parts list and a set of dimensioned projections. Select a sheet to open its vector PDF at full size.
Open all 18 Fusion drawing sheets (PDF)
| Assembly | Ballooned view and parts list | Dimensioned views |
|---|---|---|
| Full robot | Sheet 01 | Sheet 02 |
| Base | Sheet 03 | Sheet 04 |
| Yaw pinion | Sheet 05 | Sheet 06 |
| Turntable and shoulder | Sheet 07 | Sheet 08 |
| Shoulder drive | Sheet 09 | Sheet 10 |
| Arm | Sheet 11 | Sheet 12 |
| Head | Sheet 13 | Sheet 14 |
| Sensor pod | Sheet 15 | Sheet 16 |
| Flexible hose | Sheet 17 | Sheet 18 |














I modeled a welded carrier for two bicycles and compared a cantilever calculation with a static finite element model. Both indicate low stress under the 110 lbf load. The SOLIDWORKS mass estimate of 126.401 kg puts the empty rack at approximately 2.53 times its payload. That result makes the allowable vehicle moment and a gravity-inclusive fixture test central to the next iteration.
The brief called for carrying two adult bicycles across the back of a campus trolley. I set the combined bicycle load at 110 lbf. Two channels locate the tires, and a curved rail gives the rider a place to strap each frame.
The channel positions define the fore-aft load locations. The curved rail provides a tie point, so the retention load follows a different path from the vertical wheel load. Before release, the vehicle bolt pattern, rear access and clearances would need to be measured on the actual trolley.
I chose annealed 201 stainless steel and planned a welded assembly with a bolted vehicle interface. Wheel loads pass from the two tire channels through four support beams into one mounting frame. The curved rail provides the strap attachment.
The original $58.56 material estimate used a scrap price of $0.21/lb. Stock, machining time, weld labor and mounting hardware would need separate quotes for a build.
| Part | Qty | Role in the planned assembly |
|---|---|---|
| Tire channel | 2 | Receives the wheel loads and locates the tires. |
| Support beam | 4 | Transfers channel loads into the frame. |
| Mounting frame | 1 | Bolted interface to the trolley. |
| Curved rail | 1 | Tie point for bicycle frames. |
The original process plan used a bandsaw for stock preparation, a CNC mill for the holes and channel pockets, a forming die for the rail, and MIG welding for the fixed joints. Machining a channel from block stock removes material already paid for. A formed section is a candidate for the next mass and cost comparison.
I simplified the support to a cantilever with two 55 lbf loads. Their centers lie 5.25 in and 23.75 in behind the fixed end. Together they produce a bending moment of 1,595 lbf·in at the mount.
With the two load centers at 5.25 in and 23.75 in, the root reaction is 110 lbf and the moment is 55 × 5.25 + 55 × 23.75 = 1,595 lbf·in. The idealized 2 in square section has I = bh³/12 ≈ 1.333 in⁴ and c = 1 in. The worksheet rounds I to 1.33 in⁴. Using σ = Mc/I gives approximately 1,199 psi. Dividing 38,000 psi by that stress gives the reported 31.68.
This local beam calculation omits bolt preload, contact compliance and weld geometry. The forces at the actual fasteners also depend on their spacing and the stiffness of the trolley bracket.
I distributed the same 110 lbf over four wheel-load locations in the assembly model and constrained the mounting region. The stress plot peaks at about 966 psi. With a modeled yield strength of 42,350 psi, the static factor of safety is about 44.
The hand check uses a single beam and a lower strength value. Using 42,350 psi in both calculations gives about 35.3 for the beam and 43.8 for the assembly. The remaining difference is worth investigating at the same section with matching restraints. Neither calculation measures bolt slip, weld quality or bicycle retention.
The 966 psi peak is specific to the applied wheel forces and idealized mounting restraints. The source includes a dynamic stress plot but omits its excitation history. It also gives no mesh-convergence series. Neither the static plot nor the dynamic image establishes fatigue life or strap retention during travel.
The source study also plots von Mises stress at a series of mesh locations. The static trace rises to approximately 220 psi near the beginning of the sampled locations and falls toward 20 psi farther along. The assembly contour reaches 966 psi. These numbers describe different selections of the model. A trace through selected nodes can miss the global maximum.


The dynamic trace is a spatial sample at one instant. Its local peak is about 165 psi. To evaluate motion on the trolley, I would first define a vehicle acceleration history and identify the governing instant and location over the whole run. These two curves alone cannot establish a dynamic amplification factor, a fatigue margin or secure bicycle retention.
SOLIDWORKS calculated a mass of 126.401 kg, about 279 lb empty. With both bicycles, the mount would carry about 389 lbf at rest. The original study documents the bicycle load but leaves the gravity setting unspecified. The reported margin cannot establish that the installation can support that combined load.
I completed the SOLIDWORKS model and load analysis. Physical load, retention and road tests remain open.
For the worksheet’s bicycle positions, a gravity-inclusive static moment would be 1,595 + 279d lbf·in, where d is the rearward distance in inches from the mounting plane to the rack center of gravity. Each additional inch of offset adds about 279 lbf·in. The original envelope gives the overall depth but does not locate that center, so a single installed moment cannot be calculated from the slides.
The study answers a narrow but useful question. The idealized supports carry the specified bicycle load with stresses well below yield. The 279 lb empty rack changes the integration decision. I would establish the mount’s allowable force and moment, revise the section geometry against that budget, and use a fixture to check deflection and slip before any road trial.
Source: Zakary Miles, Bike Rack Design, original course design slides. Geometry and material, pp. 2–4 and 9. Load cases and calculations, pp. 5–8. Cost, manufacturing, assembly and proposed revisions, pp. 10–15.
When a job ad mentions Python, is it required, preferred, or just part of the company’s stack? I built a job-search and analytics platform that keeps the evidence for each extracted skill. A student can move from a market trend to individual openings and see how their own experience compares.
I built the ingestion pipeline, FastAPI service, PostgreSQL data model, and React interface. A scheduled workflow imports postings from Greenhouse and Lever, runs extraction and deduplication, and records market snapshots. The frontend and API were deployed through Vercel and Render.
I kept each raw posting so a correction to the extractor could be applied to older data. The first version used an Aho–Corasick matcher to search roughly 600 aliases in one pass. Short names such as “R” needed checks for case, boundaries, and nearby technical terms. Section headings helped distinguish a required skill from one in a wish list. An accepted match retained the sentence that triggered it.
On 19 July 2026, the first full run processed 12,217 postings. It found at least one technology in 8,524, extracted compensation in 8,595, and mapped 3,948 titles to standard job families. Those counts describe separate fields and overlap.
One error surfaced in the aggregate. A chart put C at roughly 20% because the matcher had picked up the final letter of “U.S.C.” in repeated legal boilerplate. After checking the stored sentences, I tightened the single-letter rule, incremented the extractor version, and reprocessed the corpus.
The search results and analytics use the same filter definition for role and geography. A posting with several matching locations contributes once. Cross-source duplicates are grouped conservatively, so two openings with similar titles do not silently become one.
In the market test fixture, Python appears in 13 of 23 postings. Three postings have no detected technology and still belong in the denominator. That puts Python’s share at 56.5%. Dropping those three would inflate it to 65%. Eleven postings actually require Python.
Location and radius queries have too many combinations to precompute. I cached exact queries between data refreshes and saved daily snapshots for a bounded set of markets. The analytics design record measured about 100–310 ms for a cold national query over roughly 12,000 jobs and about 13 ms for a cached response.
My scoring model weights skills at 55%, title at 25%, and experience at 20%. A required skill carries twice the weight of a preferred skill. When a component cannot be evaluated, its weight is redistributed across the available components.
One regression case asks for three required skills and two preferred skills. The candidate has two required skills and one preferred skill, yielding 5 of 8 weighted points. With a matching title and sufficient experience, the score rounds to 79 out of 100. The explanation names Kafka and Terraform as the gaps so the candidate can decide whether to apply.
A local evaluation on compared the extractor’s output with a frozen set of 31 hand-labeled documents.
| Check | Observed result |
|---|---|
| Technology identification | 153 correct matches, zero extra matches, zero missed labels |
| Skill requirement level | 151 of 153 matched labels correct |
| Normalized job titles | 30 of 30 labeled cases correct |
| Compensation extraction | 13 of 13 labeled cases correct |
The small labeled set was developed alongside the extractor. The legal-citation error illustrates what that evaluation can miss. Broader accuracy estimates would need an independently labeled sample across employers, including jobs with missing or ambiguous requirements. The market figures also reflect the boards covered by the pipeline.
Project repository and original previews · Engineering decisions · Labeled evaluation set · Match-scoring tests
Converting one clip should take a few clicks. Converting a folder of clips raises different questions. Can I close the browser while the files process? Can I keep the originals if a conversion fails? I built the workspace, API, storage layer, and worker around a persistent record of each file and job.
Quick Convert gives a visitor one file, one conversion, and one download. A temporary workspace adds folders, batch conversion, and ZIP export for the current browser session. A signed-in user can keep a workspace across sessions. All three use the same conversion engine.
Saving a temporary workspace changes its owner and type in place. Files, jobs, and stored objects retain their identifiers. A user who decides to keep a batch can pick up where they left off without uploading the sources again.
The browser sends an upload to FastAPI. The API identifies the file from its contents and validates the requested output against a shared format registry. It records a pending job in PostgreSQL and returns HTTP 202. The client can then query the job for progress and, once complete, its download URL.
I used the same registry for the browser’s target menu and the worker’s converter selection. Counting the August registry gives 48 input formats and 437 source-to-target pairs. For example, a video can be converted to another container or have its audio extracted. The registry routes video and audio to FFmpeg, images to ImageMagick, and office documents to the appropriate document engine.
A worker reads the source from local storage or stages a remote object on disk, runs the selected converter, and stores the result separately from the original. When FFmpeg reports a usable duration, the worker can turn elapsed media time into a percentage. Otherwise the interface displays progress without a percentage.
I used PostgreSQL for the queue so the workspace can keep the file record and conversion state together. Each worker searches for one eligible job. On PostgreSQL the query locks the row and skips work already locked by another worker. The claim commits before conversion starts, leaving the database transaction short even for a long video.
if dialect == "postgresql":
statement = statement.with_for_update(skip_locked=True)
job = await session.scalar(statement)
| Event | Worker or queue behavior |
|---|---|
| Temporary storage failure | Record the attempt and schedule a retry with increasing delay. The default limit is three attempts. |
| Invalid source file | Mark the job failed and clean up partial output. Repeating the same conversion would reproduce the error. |
| Worker disappears | Workers send heartbeats every two seconds by default. A job becomes eligible for recovery after 30 seconds without one. The cleanup pass requeues it if attempts remain. |
| User cancels | Cancel pending work immediately. For a running conversion, signal the worker and remove the partial output. |
The local filesystem is the default storage backend. With S3-compatible storage, uploads of 64 MiB or more go directly from the browser to the object store by default. The API coordinates three steps.
Counting outstanding reservations matters when two uploads start at once. Each might fit individually while their combined size exceeds the quota. Expired reservations are reclaimed so an abandoned browser tab cannot hold space indefinitely.
A local run on covered three backend test modules for the job queue, worker scratch files, and direct-upload API. 32 tests passed and two were skipped. The run used SQLite and a test storage backend. It checked behavior during interrupted work, cancellation, mismatched upload sizes, and concurrent attempts to finalize the same upload.
The two skipped cases require FFmpeg and FFprobe. They exercise rejection of a real corrupt media file and an end-to-end conversion after direct upload. The 437 registry entries describe supported routes. This run did not execute every conversion pair.
The S3-compatible implementation was exercised locally with MinIO during development. Production worker throughput, cloud transfer latency, and recovery time under concurrent load remain unmeasured. A useful next test would stop one of two PostgreSQL-backed workers mid-conversion and record the time until the other produces a single downloadable output.
Project repository and architecture · Conversion registry · Queue implementation · Backend tests